What is a construction submittal

How do submittals work in construction?

Submittals are those shop drawings, product data, samples, and mock-ups to be delivered to the design professional (the architect or engineer) for review and action as required by the contract documents. An important element of the submittal process is the preparation, review, and approval of shop drawings.

What is a submittal package?

A submittal package is a collection of submittal items grouped together by the contractor to expedite the approval process. The submittal coordinator should review and update the status of all items before submitting the package back to the contractor. To create a submittal package . Go to the Submittal Packages page.

What are submittals used for?

Submittals in construction management are shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed on the project.

Is a submittal a contract document?

Submittals are not contract documents . The contractor prepares submittals , and the architect prepares contract documents .

Who approves construction submittals?

During the submittal phase of a construction project, contractors communicate information about the materials they intend to use. In order for the proposed project to go ahead, the engineers and architects must approve the materials for compliance with the owner’s contract.

What are five uses of submittals during the construction process?

What are five uses of submittals during the construction process ? Names and location of vendors, suppliers, fabricators or subcontractors. Other steps in the process like consultant endorsements. Dates achieved to be used with the scheduled dates. Scheduled activities, by number and description.

You might be interested:  Mechanical and electrical systems in architecture engineering and construction

How do I create a submittal package?

Steps Navigate to the project’s  Submittals  tool. Click + Create > Submittals Package . In the ‘General’ tab, complete the data entry in the ‘General Information’ area as follows: If you want to add one or more existing submittals to this package , see Add an Existing Submittal to a Submittal Package .

What is a submittal schedule?

WHAT IS A SUBMITTAL SCHEDULE ? ○ A list of submittals expected by the Owner. submittals through their progression of preparation by the Contractor and approval by the Owner before the materials and/or equipment can be ordered, and how they affect the construction progress.

What are RFI submittals?

Beware of substitutions dressed in RFI or submittal clothing An RFI , which means (depending on whom you ask1) either Request for Information or Request for Interpretation, is intended to clarify, within reason, the design intent of the documents.

How do you do an RFI in construction?

Make sure your construction RFI includes the following elements: Project name and address. RFI number (in sequential order for the project) RFI title (and a brief description) Date you submitted the RFI and a deadline for the response. Name, title, company, and contact information for the requesting party.

What is a submittal log in construction?

Submittal logs are generally created at the beginning of the project as a tracking mechanism to ensure that all materials and final designs are approved by the design team prior to installation. A submittal is a way for the designer to ensure that the contractor picked one of the already approved products or an equal.

You might be interested:  How much do construction laborers make

What is a closeout submittal?

1.02 CLOSEOUT PROCEDURES. A. Submit a written certification that the Contract Documents have been reviewed, the Work has been inspected, and that the Work is complete in accordance with the Contract Documents and is ready for the Owner’s review.

Why is construction information important?

Let’s look at the main reasons why the specification is so important to the construction process: It provides clear instructions on the intent, performance and construction of the project. It can reference the quality and standards which should be applied. Materials and manufacturers’ products can be clearly defined.

What is the difference between submission and submittal?

The difference between Submission and Submittal When used as nouns, submission means the act of submitting or yielding, whereas submittal means the act of submitting .

Is submittal a word?

Noun. (proscribed, rare) Something submitted or to be submitted; a submission. (construction) Data about a product, such as shop drawings, material data, or samples.