What are submittals in construction

What is a submittal package in construction?

Submittals are those shop drawings, product data, samples, and mock-ups to be delivered to the design professional (the architect or engineer) for review and action as required by the contract documents. Various types of submittals are part of the construction process.

What is a submittal package?

A submittal package is a collection of submittal items grouped together by the contractor to expedite the approval process. The submittal coordinator should review and update the status of all items before submitting the package back to the contractor. To create a submittal package . Go to the Submittal Packages page.

What are submittals used for?

Submittals in construction management are shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed on the project.

How do you do submittals?

Submittals consist of information provided by the contractor to the design professional for approval of equipment, materials, etc. before they are fabricated and delivered to the project. Submittals can be presented in various formats, such as shop drawings, cut sheets on equipment, and material samples.

What are five uses of submittals during the construction process?

What are five uses of submittals during the construction process ? Names and location of vendors, suppliers, fabricators or subcontractors. Other steps in the process like consultant endorsements. Dates achieved to be used with the scheduled dates. Scheduled activities, by number and description.

Who approves construction submittals?

During the submittal phase of a construction project, contractors communicate information about the materials they intend to use. In order for the proposed project to go ahead, the engineers and architects must approve the materials for compliance with the owner’s contract.

You might be interested:  Holiday rambler roof construction

What is a submittal log?

Submittal logs are generally created at the beginning of the project as a tracking mechanism to ensure that all materials and final designs are approved by the design team prior to installation. A submittal is a way for the designer to ensure that the contractor picked one of the already approved products or an equal.

What submittal means?

1 : an act or instance of submitting something : a sending or delivery of something for consideration, study, or decision The council approved a resolution to authorize the submittal of five grant applications to the Alabama Department of Economic and Community Affairs, Law Enforcement and Traffic Safety Division.—

What are RFI submittals?

Beware of substitutions dressed in RFI or submittal clothing An RFI , which means (depending on whom you ask1) either Request for Information or Request for Interpretation, is intended to clarify, within reason, the design intent of the documents.

How do you do an RFI in construction?

Make sure your construction RFI includes the following elements: Project name and address. RFI number (in sequential order for the project) RFI title (and a brief description) Date you submitted the RFI and a deadline for the response. Name, title, company, and contact information for the requesting party.

What is a closeout submittal?

1.02 CLOSEOUT PROCEDURES. A. Submit a written certification that the Contract Documents have been reviewed, the Work has been inspected, and that the Work is complete in accordance with the Contract Documents and is ready for the Owner’s review.

How do I create a submittal log?

Steps Navigate to the project’s Specifications tool. Mark the checkboxes next to the specifications from which you want to create submittals . Note: Specifications must be in PDF format in order to use this feature. Click Generate Submittal Register . Click the Click here to review link.

You might be interested:  Progress payments in construction

What is the difference between submission and submittal?

The difference between Submission and Submittal When used as nouns, submission means the act of submitting or yielding, whereas submittal means the act of submitting .

Is a submittal a contract document?

Submittals are not contract documents . The contractor prepares submittals , and the architect prepares contract documents .

How do I submit submittals in procore?

Steps Navigate to the Project level Submittals tool. Navigate to the Packages tab. Click View next to the package with the submittals you want to send . If you want to send all of the submittals that are ready for review, click Send Now in the banner.