Road construction cost per linear foot

What does it cost to build a mile of road?

Construct a new 4-lane highway — $4 million to $6 million per mile in rural and suburban areas, $8 million to $10 million per mile in urban areas. Construct a new 6-lane Interstate highway – about $7 million per mile in rural areas, $11 million or more per mile in urban areas.

How are road estimates calculated?

The earthwork cost is calculated by estimating the number of cubic meters of common material and rock which must be moved to construct the road . The earthwork production rate is calculated as the cubic meters per hour which can be excavated and placed divided by the number of cubic meters per km to be excavated.

How much does it cost to excavate a cubic yard?

A typical residential excavation job runs between $1,431 and $5,051 with an average of $3,093. Though most companies charge anywhere from $40 to $150 an hour, residential jobs receive project bids. Project bids reflect cubic yards of dirt moved, anywhere from $50 to $200 per cubic yard.

How much does it cost to build a 1km road in Nigeria?

According to the CSJ report, in Nigeria , constructing a kilometer of road costs between N400 million and over N1 billion. Now, here are a few examples to support the CSJ report. Interestingly, and also in 2013, a similar contract was awarded for the 1,028km Lagos-Abidjan road project.

How much does it cost to pave 1 mile?

Every road paving plan is different — the cost of paving a road depends on where it’s located, how wide it is, and several other factors — however, a good rule of thumb is that every mile of road costs at least one million dollars to repave, taking into account labor, equipment, and pavement expenses.

You might be interested:  How to use a construction calculator

How much does it cost to pave a racetrack?

Wow. I’ve done some research, and generally it costs around $100,000 per mile for two-lane pavement. Two lanes isn’t nearly wide enough for a racetrack , though, so figure $200,000 per mile minimum in order to build a racetrack four lanes wide.

How do you calculate earthwork?

The volume between each pair of sections is estimated by multiplying the average cut or fill area of the two sections by the distance between them. Once these volumes have been calculated for each pair of sections the total cut and fill volumes are obtained by adding them all together.

How do you calculate excavation rate?

of days required for 10m3 excavation = 10/242.4242 = 0.04125 days. Likewise, based on the capacity of other equipment, labors etc., their cost is calculated. Contractors profit is also added to the total cost of labors and machineries. Then grand total gives the rate of excavation per 10m3 of soil excavation .

How much does it cost to have land leveled?

Land levelling may be necessary for a house foundation, backyard, driveway, shed and similar construction projects and the cost to level land ranges between $1,000 and $6,000 depending on the area size and job complexity, with an average price of around $2,500.

How much does a excavator cost per hour?

You can expect to pay anywhere from: $95/hour for a bobcat or small two-tonne excavator. $105 /hour for a 6-tonne excavator. $140/hour for the combined service of an excavator and tip truck.

How much does it cost to excavate 1 acre?

Residential Land Clearing Cost Per Acre . In general, you will pay $500 to $5,600 per acre to clear land. This does not include including topsoil stripping, excavation , hauling dirt to a landfill, grading and other tasks necessary to create a finished lot.

You might be interested:  Resumes for construction project manager

How much does it cost to build a road in Africa?

Perhaps a rough guide would be $8-10,000/km for an earth road and $10-15,000/km for a gravel road inclusive of basic structures but exclusive of major structures. Periodic maintenance might be $2-4,000/km per cycle and routine maintenance up to $1,000 per year.

How a concrete road is constructed?

It deals with various aspects of cement concrete road construction such as materials, proportioning, measurement, handling and mixing, subgrade and sub-base preparation, formation, joints, reinforcements, concrete mix laying, finishing, curing, and plant and equipment.

How much does it cost to build a road in India?

“ Building a two lane highway with paved shoulder costs anywhere between Rs 6 crore to Rs 8 crore per km. The per km cost shoots up anywhere between Rs 14 crore to Rs 20 crore for a four lane highway .