How do you read grade elevations on plans?

For example, given a benchmark at 100.00 and a grade elevation at 101.43, the difference is -1.43, which indicates that the elevation is 1 foot and some odd inches above the benchmark. Multiply the decimal part of the difference times 12 to find the number of inches. For example, 0.43 x 12 = 5.16.

How do you read a station number?

Station numbers usually increase from the beginning of the project to the end of the project. Also, stationing usually runs from South to North or from West to East. The beginning station of a project is usually arbitrary. Generally, it will be 10+00 or 100+00.

How do you read a site plan?

Tips on How to Read a Site Plan Find The Title Block. In the bottom right corner of most plans , you’ll find what’s called a title block. Learn the Plan’s Scale. Determine the Orientation of the Plan . Know the Datum Point. Note the Site’s Contours. Locate Existing Structures.

What are the 6 types of construction drawings?

All the types of construction drawings can be segregated into the following sets of drawings : Architectural Drawings . Structural Drawings . HVAC Drawings . Electrical & Plumbing Drawings . Firefighter Drawings . Miscellaneous Drawings .

What are the five phases of construction?

A construction project entails 5 important stages: initiation , planning , implementation, performance and monitoring , and closing.

What is a construction plan?

A construction plan is a detailed document, both written and visual which outlines how you will complete a project or portion of one. The document is typically composed of the following: A narrative or written document outlining how the various components will be approached. A detailed or milestone construction

You might be interested:  How to make grass with construction paper

How do you read elevation?

On elevation charts, the elevation (listed in feet or meters above sea level) is located on the left side of the chart and reads from low (on the bottom) to high (on the top). The distance of the race is located along the bottom of the chart and will read from left to right in miles or kilometers.

How do you shoot elevations at a level?

As important as it is, shooting grade is simple. Set up the tripod of the laser level or transit; spread the three legs, each an equal distance from the other two. Position you partner within the building site or in the pipe trench. Set the grade rod at different locations on the site.

How do I calculate my grade based on distance?

To calculate percent slope, divide the difference between the elevations of two points by the distance between them, then multiply the quotient by 100. The difference in elevation between points is called the rise. The distance between the points is called the run. Thus, percent slope equals (rise / run) x 100.